Wednesday, October 2, 2013

Ginormous Compressor Station: Wyalusing, PA

A massive site, still under construction. The Compressor on the left (west) is the CNYOG.
The smaller compressor nearest the road (to the south, or bottom of the photo) seems to be an existing compressor for the TGP300 line. The rest of the complex, with several additional large compressors is apparently in support of the TGP300 Northeast Upgrade Project.

 Check out Bill Huston's blog report here. You will find many maps and pictures (which I can't put up here easily!).  Well worth checking out for yourself. 
 
If you are a member of the Hutchinson family, as I am, this compressor station is across the river from Frenchtown, not very far as the crow flies.  The air pollution from compressor stations is very significant. Also light and noise pollution.  But I am mainly concerned about the air quality.  Our property is not safe with a compressor station like this nearby.  But we may not smell or see anything.  It is there nonetheless.  Yes, we have been fracked on our property.  No, we don't have wells, but we have been fracked, if you get my drift.  Drilling is so much more than just fracking.  The industry would have us focus on fracking only, while it goes about its business of ruining the environment and our property forever.  No going back.
 
Links to more information:
 
 
And you can search this blog for many more posts from the last few years. Use the "Search this blog" feature.
 
 



Monday, February 18, 2013

George Feighner of New Jersey: "I cry for my trees..."

Published on Feb 17, 2013 George Feighner, wept today (2/16) as 70-year old white pines were clearcut less than 100 feet from his front door by pipeline contractors who started cutting yesterday morning after receiving a Notice to Proceed from the Federal Energy Regulatory Commission on Thursday (2/4). George is an 86-year old man in Montague, NJ living just off the banks of the Delaware River, and had his 60-acre property condemned for eminent domain to be the path of the Tennessee Gas Pipeline Loop 323. The upgraded pipeline will transport Marcellus Shale gas to Mahwah, NJ giving enormous incentives for the industry to fully develop the shale and build new natural gas power plants, including the one proposed in Newark, NJ. George has been involved in a legal appeal for over a year of the Federal Energy Regulatory Commission's decision. FERC members have all been appointed or re-appointed by Barack Obama who spoke in favor of "cutting the red tape for oil and gas permits" during his State of the Union. Obama holds the power to order his Army Corps of Engineers representative on the Delaware River Basin Commission to stop this project and put it under further review and has yet to act, as well as Governor Andrew Cuomo, Governor Jack Markell, Governor Chris Christie, and Governor Tom Corbett. Tennessee Gas Pipeline company is itself a subsidiary of El Paso, which is a subsidiary of Kinder Morgan of Tar Sands oil pipeline fame. Check out our website for actions you can take to support our struggle to stop the Tennessee Pipeline, even if you can't be with us here in Pennsylvania and New Jersey. www.notennesseepipeline.blogspot.com By: Stop the Tennessee Gas Pipeline

Friday, February 25, 2011

Friday, June 18, 2010

Marcellus Shale: Pipelines Are Next, Eminent Domain On the Table

Photo credit: Carol Manuel


Pipelines like this one in Asylum Township, Bradford County, are being installed in many places, and the gas industry may, in fact, be able to rely on eminent domain to access right-of-way.  The Pennsylvania Public Utility Commission (PUC) is considering at least one application from a gas pipeline company seeking public utility status. Laser Marcellus Gathering Company, LLC, hopes to obtain a certificate of public convenience from the PUC "to operate as an intrastate natural gas pipeline providing gathering and transportation services to unaffiliated producers."  Under consideration is a 30-mile long pipeline to connect gas wells in western Susquehanna County and the Southern Tier of New York to the Millenium Pipeline at a location in Broome County, NY.  Future projects may include additional delivery points to the Tennessee Gas Pipeline and the Stagecoach Natural Gas Storage Facility in PA.  Property owners may be forced against their will to surrender right-of-way via emminent domain.  Hearings at the PUC are to take place in July.

Read the whole article here.

Thursday, June 3, 2010

Tennessee Gas Pipeline: The 300 Line Project



Here is the Project Summary.

When will Federal Energy Regulatory Commission complete its review?

Plans call for a pre-filing application with the Federal Energy Regulatory Commission under the National Environmental Policy Act (NEPA) to be filed with the Federal Energy Regulatory Commission in the fall of 2008. The initial review process could range from 12 to 18 months to complete. Following that, Tennessee expects to file a full application to construct the project with the Federal Energy Regulatory Commission in July 2009. If approved, the project would be built in two phases.

Following receipt of all applicable approvals, construction may begin as early as July 2010. The project is planned to be in service by November 2011. Public outreach, which began in the summer of 2008, will continue throughout construction of the project.